Sitting Steel Rigs 11.7 Tons On Maspéro 2 Bridge

The steel rig weighs over 10 tons at the renovation project, Maspéro 2 Bridge Decoration in Soc Trang collapsed on July 6. Thankfully, no injuries. About 15h on 6/7, steel rigs weighing 11.7 tons used to decorate lights on Maspéro 2 bridge in Ward 4, Soc Trang City (Soc Trang province) collapsed. The incident occurs when the contractor completes the 2/3 of the work

. The collapse of steel rigs does not cause damage to people. A part of the steel rig weighs over 11 tons collapsed into the Maspéro River, Soc Trang City. Photo: Viet Tuong
With ZING, Mr. Chau Ngoc Hoa, Director of Soc Trang City Project Management Board, said the steel rig has just collapsed under the renovation project, decorating 3 bridges 30/4, Maspéro 1, Maspéro 2 on the Maspéro River. The total investment capital of this project is over VND 12 billion. Decoration at Maspéro 2 Bridge worth over VND 4 billion. The project is expected to be put into use at the end of 2021. Steel steel collapses when the contractor performs about two-thirds of the job. Photo: Nhat Tan.Theo Mr. Hoa, this steel rig weighs about 11.7 tons, 60 m long, 13 m horizontal, the highest place of 14 m
Due to construction during the rainy season, the steel rig collapsed when the wind is shocked. The relevant units are overcoming the consequences to clear the traffic jams, statistics damage.

. Dịch vụ: Thiết kế website, quảng cáo google, đăng ký website bộ công thương uy tín

Related news